Though we all have the same amount of time, it just seems to slip by me faster than it does other people. It's not that I'm lounging around smoking cigars, playing poker all night, and ignoring my work (okay, not usually). It's that I take on much more than I should and everyone suffers. And the projects that I take on magically grow from cute, innocent endeavors into eight-armed monsters that crush my schedule over and over.

Project managers know - or should know - the iron triangle of project management sometimes called the triple constraints of project management because all projects are constrained by these three elements: time, cost, and scope. My nemesis is the angle on the left: time.

Any project, from developing a new piece of software to building a new house, takes some amount of time. The relationships between the scope of the project, time, and cost should balance. If there's not enough time or budget, the project is doomed. (No kidding.)

The real problem? Planning. Delegation. And learning to say no. First, we must define the product scope: the verifiable, tangible deliverables that make the customer happy (or happier, depending on the customer). Once all agree on the product scope, then it's on to the project scope—all of the work and only the work to create the project deliverable. The product scope and the project scope are dependent on one another; if you change a detail in the product scope—gosh, the project scope will change, too. And these changes take time.

Now, sometimes I'm late and it just ain't my fault. (Come on, I did say 'sometimes'.) For example, I was working on a project for a company that couldn't decide exactly what they wanted. It was like one of my usual dates: 'I don't know what I want, but this isn't it.' We'd go round and round through feasibility studies, new versions of the training manual, class development, and more frustration—then they wanted to know whether I could still hit the target deadline for project completion. My mental response? 'Yes, just as soon as I get back from my bike ride to Hawaii.'

On any given day the phone rings, email chimes, or the fax spits out some new request, and without thinking we say yes. That failure to think is killing us. A little change here, an addition there, and four or five new projects coming in; time disappears faster than a plate of donuts at a Weight Watcher's meeting.

But this isn't an article on how to whine. We're all crushed for time; some of us just manage it better than others. When it comes to project management, I know that the time management discipline is my Achilles' heel. In the past, I would gladly take on the work without thinking, planning, and delegating. But I'm getting better about it—I told someone no last week. It was sad and disappointing, but I can't let things pile up anymore and current commitments slip by.

The Official Approach (How It Looks on Paper)

In the perfect project-management world, which doesn't exist, there is a logical, practical approach to calculating how long a project should take to complete. Let's pretend that we're living in this perfect project management world and see how things should go.

First we work with the customer to define the product scope—describing the thing that they want us to create. Then we create the project scope—all of the required work and only the required work to create the product scope. And then, boy oh boy, we create the work breakdown structure (WBS).

The WBS is not a list of the activities to complete the project. That's right. The WBS is a deliverables-oriented decomposition of the project deliverables—not the project work. Once we've created the WBS, we can generate a list of the activities that the project team will need to perform to create the identified deliverables.

The activity list should conform to a fun heuristic called the 8/80 rule, which states that the smallest element of the WBS, called the work package, should take no more than 80 hours to create and no less than 8 hours to create. We don't want the WBS to be so granular that we're dictating each step to create the deliverable; nor do we want the work package to be so large, as in more than 80 hours large, to leave much of the work open to interpretation. (As with most rules, of course, there are exceptions.)

The activity list should then be arranged in the order in which the activities must or should take place. Many of the activities will rely on hard logic; they must occur in a particular order for the project to be successful. We have to install the operating system before installing the application. Soft logic relies on management discretion. For example, we could create a fancy script to install the operating system and then call a remote server to pull the application and install it on the target machine once the OS has been installed. But we may choose not to do that. It's preferential logic based on experience, the nature of the work, or your mood on that particular day.

Now the real fun starts. As the expert time-starved project manager, you examine the work sequence and realize that you can actually take several paths to project completion in tandem. So you map out the work visually in a project network diagram (PND). A PND visualizes the work and allows you to find the critical path. The critical path is not the path with the most important activities; it's the longest path to reach the project's conclusion. The critical path reveals the activities that, if late, will cause your project to miss its target completion date. You can find the critical path by simply counting the duration of activities from Day 1 to project completion.

But what of the activities that are not on the critical path? These activities have float—the amount of time by which an activity can be delayed or late without affecting the project end date. There are some fancy formulas called the forward and backward pass to calculate the float for each activity.

You don't have to be a genius to do the math, but it's easier to just let your project manager information system (such as Microsoft Project) do the calculations for you.

Your critical path can change. Some of your non-critical path activities may be late, additional activities may be added to your project, or the duration of non-critical activities may be revised. Your project may take longer if any of this happens, and you'll have a new critical path.

Between each set of activities in your PND are relationships that describe how and when successor and paired activities may begin. There are four different relationship types, though chances are that you'll use only one or two of them:

· Finish-to-start. This most common of relationship types means that the upstream activity must finish before the downstream activity can begin. For example, you must create the disk image before you can push it out to 1,200 machines.

· Start-to-start. This relationship allows two activities to start at the same time, but not necessarily end at the same time. For example, imagine that your organization has a new piece of software that all users will have installed on their desktops. In your project plan, all users must complete a four-hour training session before the application is installed. You create a system that installs software on users' desktops while they're in class for the new application. Both activities start at once, but they sure won't finish at the same time.

· Finish-to-finish. This relationship requires both activities to end at the same time. For example, you're managing a project to redesign your new web site. To promote the new chic look, your organization will mail a million postcards to current and potential customers. Your project plan requires that the final modifications to your web site and the postcards arriving at your prospects' offices finish at the same time. Fascinating.

· Start-to-finish. This is the most unusual and least-used relationship of all. It's special. You'll find this relationship when you're using just-in-time scheduling. Basically, the upstream activity must start so the downstream activity can finish. Imagine that you're a manufacturer of plastic bottles. You don't have room on your shop floor for an infinite amount of plastics, so you only order plastics when your supply is running low. The depletion of plastics by current activities triggers an order for more plastics so you can create more bottles in the future.

Coupled with each of these relationships you can use lags and leads. A lag is simply waiting time, while a lead is hurry-up time. For example, you're installing a brand new network in a building. You'd like the cable installation and the installation of the punch panel to happen in tandem. Realistically, however, the punch panel needs a head start on your cable runs, so you add lag time to the cable installers. This plan allows both activities to happen at once, but requires the cable installers to wait a bit until they begin their activity. (Cable installers usually have no problem waiting.)

Sometimes project managers have to hurry things along in a project. This is where lead time comes into play. It allows you to move activities closer to the project start date by subtracting time from each activity's scheduled start time. Lag is positive time; lead is negative time.

Estimating Project Duration

The estimated project duration is based on the sum of the activities. With some math magic, we can predict the best, worst, and most likely scenario for how long each activity will take, and ultimately how long before we put this beast to bed and move on to the next.

To create an estimate that's accurate or close to accurate, it's really more than just adding up the activity durations. We also have to consider several factors that could wreck the schedule, drive managers nuts, and cause our hair to fall out:

· Constraints. A constraint is anything that restricts project options. You've hired a consultant who is only available on December 29. You've enrolled your project team in a training class on January 20. Sam the systems engineer is taking a four-week vacation in February. All of these are constraints—and there are tons more.

· Assumptions. We all know what happens when we make an assumption (think ass and umption). For example, we assumed that the vendor was honest when saying that the new servers would be delivered by October 1. We assumed that the client was using Windows 95 or better, not OS/2. We assumed that we could have access to the job site 24/7, not just during business hours. If we don't document and share these assumptions, it's trouble.

· Available resources. Have you ever calculated that you'd need four network engineers to pull and install the cable, only to discover that you only have two network engineers for your project? If your required resources aren't available, your project will be hurting.

· Law of Diminishing Returns. The Law of Diminishing Returns controls yield against the amount of labor available. Suppose we have an activity that will take 40 hours with two network engineers assigned. If we add two more network engineers to the activity, can we finish the work in 20 hours? Maybe. If we add 40 network engineers to the activity, can we get done in a few minutes? Not likely. In addition, not all activities are effort-driven; many are of fixed duration. This is a nice way of saying that it doesn't matter how many experts you throw at the activity—it will still take the same amount of time to complete.

· Parkinson's Law. Parkinson's Law states that work will expand to fill the amount of time allotted. Imagine that Joe says an activity will take 40 hours to complete, although he knows he could finish the work in just twelve hours. He's added padding to account for potential mistakes, issues, and games of solitaire he may encounter. Magically the task will grow to take the allotted 40 hours. Think of your workload the day before you leave for vacation. You can crank and get it done. But the day after vacation? Takes all day to send one email. (Maybe not you, but probably that guy in the cube next to you.)

· Risks. Business risk can have an upside or a downside—although we usually think of risks with the downside. Most risks that come into fruition have potential to delay the project work, add activities, and in some instances require us to wave the white flag of surrender. (I'll cover risks in more detail in another article. I know, another time management issue for me. Thanks.)

Time Management and the Crystal Ball

How do we ever know how long any given activity will take? For some activities, you can rely on experience. Other activities have to rely on expert judgment, historical information, and approximation. Approximation?! Yep. Consider any IT project you've ever managed, worked on, or heard about. Each IT project is subject to the first-time, first-use penalty. Just about every IT project is unique. Even if it's an integrator installing the same old piece of software over and over in different environments, there are unique aspects to each environment. No two IT environments are identical. Even if it comes down to the humidity in the air, the ghosts in the machines, or the users who will crunch and crank on the software, there are always differences.

These subtle and sometimes not-so-subtle differences can drive us crazy, or inspire us to take up professional roller hockey. These unique configurations also confound best efforts to predict how long an activity will take to complete. Sometimes you think you know and other times you know that you don't know.

And now a word from reality: That's why estimates are called estimates. Management and customers don't seem to get this part, do they? Have you ever given an ad hoc estimate where you pulled a duration estimate out of the sky? This is a rough order of magnitude (ROM) estimate; a simple, ballpark guess that management and customers are certain to hold you to. No fun for you—just them. I encourage you to not give any ballpark estimates. If you must, add an asterisk to your verbal quote, indicating that this is an ROM estimate and that it can be way, way off—from 75% up to 125%. Otherwise, you're stuck with the number you throw out there. Should your actuals be different from the ROM, you've heck to pay. Right?

Time To Wrap This Up

If time management were easy, everyone would do it. The biggest input to effective time management is effective planning. As project managers, we must have control over our project schedules, which requires a constant eye on activity duration estimates; actual time committed to activities; and expert judgment, guts, and experience to make refinements to our schedule when appropriate. Of course, it's never fun when a project manager replaces a bad date with another bad date.

We all have the same amount of time. The only thing we really control is what we do with it.
Joseph Phillips

About the Author:

Joseph Phillips is the author of five books on project management and is a PMI Project Management Professional, a CompTIA certified Project Professional, and a Certified Technical Trainer. For more information about Project Management Training, please visit Project Seminars .

Article Source: http://www.articlesphere.com/Article/Managing-the-Project-Time/134585

Article Tags: project time
 This Article has been viewed 422 times.
  

Related Videos



 

Related Articles

 
 

Listed below are more articles related to the above article from the "Project Management" article category.

People interested in the above article "Managing the Project Time" are also interested in the related articles listed below:

 
Project Management has been extremely useful in bringing changes in the current professional scenario. Project management knowledge is vital to organizations because all organizations need to be able to implement change and with the right approach towards projects organizations can achieve much more than they already do without wasting time and resources. India's three major metropolitan cities Delhi, Bangalore and Pune have been declared on the world map as the hub of some of the key businesses.
Project management is, in fact, a structured way of working and recording events that can bring order and coherence to any set of tasks with a predetermined goal. All projects, large or small, are set up to create something which is new and beneficial for the organization. As projects are designed to bring about the necessary changes in an organization they are bound to face a lot of resistance at various levels of the organization. This is where the need for a project manager arises as each step taken towards implementing the project will be carefully assessed and decided upon by the project manager.
Can you believe it can take over 65 specialty vocations to construct a plain and simple two storey home? Each one of these specialty tradesmen are likely going to complete their own tasks systematically. There has to be a complete project plan established where each of the different tradesmen can work together in achieving their particular tasks to the satisfaction of the owner. That team might include the builder, designer (architect) various engineers, estimators, interior decorators, landscapers, real estate agents, strata managers, access consultants, and so on. Let's talk about the aspects of the access consultant, and what his job demands.
In a construction environment where projects are few and far between and where profits and budgets have been squeezed (if there is any left at all), project execution is an essential element for an organization's survival. While execution is a great buzzword, it can be difficult to make it a reality, especially at the levels needed in today's market. Organizations may need a fresh commitment to a culture or environment that fosters execution; a follow-through environment for strategies and goals communicated from the executives. Even though many construction executives focus sincere effort on strategies and goals, successful execution includes commitment by the executive at the implementation level.
Project management is a concept that can sound very confusing or even scary for many people. But in our every day life we're facing problems that sometimes needs a plan in order to be solved. That means we have a project waiting to be done and looking for some ways to manage it. Wouldn't be useful in such circumstances to have some well known methods capable to help us to solve our problems? Of course it will be and the good news is that they really exists. But we have to be very carefull, because they will not solve the problem on our behalf, they will only help us. It's our duty to use it properly in order to get the best results because they won't guarantee the project's success.
Project designing from start is a hard and tangled procedure. This would require the detailed analysis and projection of what needs to be concluded in order to carry the design. During the provision phase, you would have to acquire from the buyer what the targets and targets are, shaping the span and then making a design on how you will put this into question. The director is also expected to render a feasibility subject in order to determine if the project is deliverable and lucrative. He is also in charge in collecting the project placement also as the plan squad who will render the technical acquisitions asked to reach the established aims.
In a design, it is imperative that the design director all together with with the assistance of his group produce and work out a design schedule and time table. Taking a project schedule will cater a founding on how long a design is waited to function before it can be accomplished and delivered.
Article Directory Home All Categories Business Project Management Managing the Project Time
 

Can't find what you're looking for? Try Google Search!
 
Copyright © 2005 - by Larry Lim, Singapore - Article Search Engine Directory at ArticleSphere.com™
All Rights Reserved Worldwide. All Trademarks and Servicemarks are the property of the respective owners.