Article Sphere Logo
 
Main Article Categories

 Alternative Medicine
 Arts And Entertainment
 Automotives
 Beauty
 Business
 Communications
 Computer And Technology
 Disease And Illness
 Finance
 Food And Beverage
 Health And Fitness
 Home And Family
 Home Based Business
 Insurance
 Internet And E-Business
 Legal
 News And Society
 Pets And Animals
 Product Reviews
 Real Estate
 Recreation And Sports
 Reference And Education
 Self Improvement
 Shopping
 Travel And Leisure
 Women Health And Fitness
 Women Interests And Issues
 Work At Home
 Writing And Speaking
 All 511 Categories
 
"Business Process Management" Article
 Article Directory Home Business Business Process Management

The DMAIC Method in Six Sigma

By Expert Author: Peter Peterka
View Summary | Submitted: 2005-11-04 | Word Count: 883 words | Views: 183 view(s)
Peter Peterka
The Six Sigma DMAIC process methodology is a system that brings measurable and significant improvement to existing processes that are falling below specifications. The DMAIC methodology can be used when a product or process is in existence at your company but is not meeting customer specification or is otherwise not performing adequately.

DMAIC is an acronym for five interconnected phases:

* Define the project goals and deliverables for both internal and external customers
* Measure the process to determine current performance
* Analyze and determine the root cause(s) of the defects
* Improve the process by eliminating defects
* Control future process performance

Step One: Define

In the Define phase, the Six Sigma project team identifies a project for improvement based on business objectives and the needs and requirements of the customers. Six Sigma is about "solving a problem with an unknown solution." To unearth the solution, the problem needs to first be defined in concrete measurable terms. The team identifies critical-to-quality (CTQ) characteristics that have the most impact on quality-separating the "vital few" from the "trivial many." With the CTQs identified the team can create a map of the process to be improved with defined and measurable, deliverables, and goals.

Step Two: Measure

In the Measure phase, the team begins with the proper metrics. Critical measures that are necessary to evaluate the success of the project are identified and determined. The initial capability and stability of the project is determined in order to establish a measurement baseline. Valid and reliable metrics to monitor the progress of the project are established during the Measure phase; input, process, and output indicators are identified. Once the project has a clear definition with a clear measurable set of indicators, the process is studied to determine the Key Process Steps and an operational plan defined to measure the indicators. Potential impacts on CTQs from each input are considered with respect to the defects currently generated in the process. Key Inputs are prioritized to establish a short list to study in more detail and to determine the potential ways the process could go wrong. Once the reasons for input failure are determined, preventative action plans are put into place.

Step Three: Analyze

Through the Analyze phase, the team can determine the causes of the problem that needs improvement and how to eliminate the gap between existing performance and the desired level of performance. This involves discovering why defects are generated by identifying the key variables that are most likely to create process variation. As the Six Sigma team moves through the Analyze stage and subsequent Improve stage of the process they will discover various process improvement scenarios and determine which has the best net benefit impact to the company. A common error people make when they discuss Six Sigma is thinking that the DMAIC process takes too long to achieve improvements. This is far from the truth. Quick improvements are often achieved early in the project and frequently already implemented by the time the team reaches the Analyze phase. If the team has not already identified major improvements, then the breakthrough often results from careful process analysis with data. Six Sigma analysis techniques are valuable tools to uncover more difficult solutions.

Step Four Improve

The Improve phase is where the process transitions into solutions. Critical inputs have been verified and optimized toward nailing down the problem causes. Once problem causes are determined in the Analyze phase, the team finds, evaluates through testing, and selects creative new improvement solutions. The team identifies and quantifies what will happen if needed improvements are not made and what will happen if the improvements take too long. This develops a cost/benefit analysis. More often than not simple process experimentation and simulation bring the team big gains in this step. Also at the Improve stage, the team develops an implementation plan with a change management approach that will assist the organization in implementing and adapting to the solutions and the changes that will result from them.

Step Five: Control

Success in the Control phase depends upon how well the team did in the previous four phases. The keys are a solid monitoring plan with proper change management methods that identify key stakeholders. Lessons learned are now implemented and tools are put in place to ensure that the key variables remain within the acceptable ranges over time so that process improvement gains are maintained. The team develops a project hand off process, reaction plans, and training materials to guarantee performance and long-term project savings. Documenting the project is very important so that the new procedures and lessons learned are maintained and provide concrete examples for the organization. At the close of the Control phase, ownership and knowledge is transferred to the process owner and process team tasked with the responsibilities. Finally, the team identifies what the next steps are for future Six Sigma process improvement opportunities by identifying replication and standardizations opportunities and plans.

Step Six: Synergize

This extra step is to ensure the gains a Six Sigma Team has made are shared with the organization as a whole. This sharing is needed to help create a learning organization. Integrating and institutionalizing the lessons learned and the improvements made multiply the real gains generated by the Six Sigma project. A Six Sigma project should not be an isolated process. It is not the end but just the beginning.
About the Author/Author Bio

Peter Peterka is the Principal Consultant in practice areas of DMAIC and DFSS. Peter has eleven years of experience performing as a Master Black Belt, and has over 15 years experience in industry as an improvement specialist and engineer working with numerous companies. Visit http://www.6sigma.us

Article Source: http://www.articlesphere.com/Article/The-DMAIC-Method-in-Six-Sigma/1572

This Article has been viewed 183 times.

Comments on this Article


More "Business Process Management" Related Articles

 

Listed below are more articles related to the above article from the "Business Process Management" article category.

People interested in the above article "The DMAIC Method in Six Sigma" are also interested in the related articles listed below:

Six Sigma is basically a business process that allows companies to improve their profit margins. Six Sigma stands for Six Standard Deviations. Six Sigma methodology provides the techniques and tools to improve the capability and reduce the defects in any process. (Sigma is the Greek letter used to represent standard deviation in statistics) from mean.
The ability to choose is one of the greatest gifts humans have. However, the gift is only yours when you choose to consciously use it. You make hundreds, if not thousands, of choices every day - often with no realization that you even made a choice. What to wear; what to eat; where to go; wear a coat; every single thing you do involves making a choice. However, making these choices - every day, more than once - will impact your future in very positive ways, if you choose.
PRINCE2 Foundation Qualification will be an asset to anyone who comes into contact with project management.
Tracking assets is an important concern of every company, regardless of size. Assets are defined as any 'permanent' object that a business uses internally including but not limited to computers, tools, software, or office equipment. While employees may utilize a specific tool or tools, the asset ultimately belongs to the company and must be returned. And therefore without an accurate method of keeping track of these assets it would be very easy for a company to lose control of them.
There are some companies out there as small as two people that are ISO certified. In terms of size, companies range from the very small, to under 100 employees, to between 200 - 300 employees.
Once the manuals are done, processes are documented, and people trained, the company will contact a registrar to schedule their audit. Then they will go through a document review and assessment audit.
Six sigma is now the most common continuous improvement tool in business. It is often combined with lean manufacturing to form the lean six sigma improvement method.
Article Directory Home Business Business Process Management

Can't find what you're looking for? Try Google Search!
(Search in 26 languages: English, Spanish, French, Japanese, Arabic, Italian, German,
Chinese Simplified, Chinese Traditional, Dutch, Korean, Portuguese, Russian, Greek, Serbian
Slovak, Hebrew, Swedish, Romanian, Polish, Norwegian, Finnish, Danish, Czech, Croatian, Bulgarian)
 
 
Copyright © 2005 - by Larry Lim, Singapore - Article Search Engine Directory at ArticleSphere.com™
All Rights Reserved Worldwide. All Trademarks and Servicemarks are the property of the respective owners.
Template Design by Internet Marketing Singapore | Internet Marketing | Singapore Classified
Español Français Bulgarian 汉语 漢語 Croatian Czech Danish Dutch Finnish Deutsch Ελληνικά Italiano 日本語 한국어 Norwegian Polish PortRomanian Русско Serbian Slovak Swedish [أربيك] Hebrew